Rideaucrest Home Mechanical Replacement – Consultant Services (2nd Stage)
Posted
-
Nov 12, 2026
The City of Kingston seeks professional engineering services from preliminary design through construction administration for mechanical replacements at Rideaucrest Home, its non-profit long-term care facility. The scope includes water source heat pump terminal units, high-wear components of existing make-up air units, fluid coolers, and the domestic hot water system with associated equipment. This invitation-only second-stage RFP includes an initial options analysis to explore alternative systems and strategies for reducing energy use and greenhouse gas emissions.

