Rehabilitate Terminal Apron Pavement, Phase 2 Decatur County Industrial Air Park (BGE)
Posted
-
Nov 5, 2026
Pavement rehabilitation efforts for the east end of the existing apron. This includes PCC slab replacement, spall repair, crack repair, joint sealing, and taxiway marking; 26,000 LF of route, clean, and seal existing PCC joint; 1,275 SY of plain portland cement concrete pavement, class no. 1 concrete 6" thick; 310 LF of trench drain ribbon repair; 225 SF of pavement marking, permanent, yellow, including type iii reflective media and microbicide. See attached file.

