CityMA
Posted
Sep 30, 2026
Oct 28, 2026
Holden - Water Meter Replacement Program
provide installation of approx 1,500 residential water meters and AMI modules.
Description: The City of Nanaimo seeks professional consulting services to develop a long-term water meter replacement and modernization strategy. Further scope details are provided in Section 5 of the Terms of Reference. This request for statements of qualification is the first stage of a two-stage procurement process.
City · BC, CA
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Nanaimo.
Adjacent opportunities open for bidding right now.
CityMA
Posted
Sep 30, 2026
Oct 28, 2026
provide installation of approx 1,500 residential water meters and AMI modules.
CityGA
Posted
Jun 5, 2026
Nov 4, 2026
Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.
CityGA
Posted
Jun 5, 2026
Nov 4, 2026
Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately 705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.
CityWY
Posted
Sep 29, 2026
Nov 10, 2026
Project consists of but not limited to approx. 83 EA 5/8" x 3/4" Water Meter; 7 EA 5/8" x 3/4" Interior Water Meter; 43 EA 5/8" x 3/4" Water Meter Pit; 17 EA 5/8" x 3/4" Water Meter Pit-relocation; 60 EA 5/8" x 3/4" Curbstop; 8 EA 1" Water Meter; 3 EA 1" Water Meter Pit; see outside link for more details.