Posted
-
Oct 16, 2026
Tununak Airport Rehabilitation
Work includes application of dust palliative to all improved gravel surfaces, replacing the airfield lighting system, relocating the rotating beacon to a tip-down pole, replacing the primary and secondary wind cones and segmented circle, installation of aircraft tiedown anchors and signage, minor repair to the access road bridge, and replacement of the fencing and bollards near the snow removal equipment building.
