Iowa Department of Agriculture and Land Stewardship
State AgencyIA
Posted
-
Oct 27, 2026
Nutrient Reduction Wetland Project RFP
This project is for a Breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, aluminum water control structure, stoplog storage structure, riprap with concrete grout and seeding. This project includes just under 6,000 CY of earthwork, 2,172 SF of steel sheetpile, 378 LF of pipe installation, 672 tons of riprap, aluminum water control structure, aluminum CMP riser inlet, 118 cubic yards of concrete grout and 17.3 acres of seeding.
