J. F. Drake State Technical College
Higher EducationAL
Posted
Aug 17, 2026
Oct 15, 2026
Mechanical Equipment Relocations Drake State (Advertisement for Prequalification)
Work includes mechanical equipment relocations drake state.
Description: Work includes mechanical equipment relocations drake state.
HigherEducation · AL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
J. F. Drake State Technical College
Higher EducationAL
Posted
Aug 17, 2026
Oct 15, 2026
Work includes mechanical equipment relocations drake state.
Muscle Shoals City School District
School DistrictAL
Posted
-
Oct 29, 2026
Prequalification and subsequent bids for the construction of the McBride Intermediate School.
Alabama Department of Corrections
State AgencyAL
Posted
Oct 8, 2026
Nov 12, 2026
Prequalification for general contractors and bids for generator system upgrades at St. Clair Correctional Facility, Wetumpka Complex, Easterling Correctional Facilities, and North Alabama CWC Dorm J Building.
Central Utah Water Conservancy District
Special DistrictUT
Posted
-
Feb 18, 2027
The Project includes installation of new underground electrical power and communication conduits and conductors between the Hades Diversion and the inlet into the Strawberry Aqueduct System (SACS) and the Docs Diversion and its inlet into SACS, associated electrical infrastructure upgrades, along with river crossings at the Duchesne River and Hades Creek. The Project will replace aging electrical infrastructure and improve communications reliability at the Hades and Docs Diversions and along the associated feeder pipelines. Existing direct-buried conductors will be abandoned in place and upgraded with new power conductors installed in direct-buried conduit. A new fiber optic backbone will also be installed between the major facilities to replace the existing radio communication systems while providing spare capacity for future expansion. Existing power and radio communications will remain operational during construction until the new facilities have been commissioned. The Project includes new electrical distribution systems, power and fiber handholes, underground conduit, electrical equipment upgrades, and new power connections at structures and manholes throughout both pipeline corridors.
Decision makers connected to this RFP from J. F. Drake State Technical College.