Rock Island County Forest Preserve District
Special DistrictIL
Posted
Oct 8, 2026
Oct 22, 2026
Lake George Dam RFP
Project shall consist of the following work efforts mobilization, safe spillway access, removal of existing joint sealant and replacement in-kind, excavation of existing drainage rills [ref: plan], filter fabric, riprap (rr-5), partial depth concrete repair at spillway, crack sealing at spillway wall, cut of existing anchor bolts and slope restoration.
