CityMA
Posted
Oct 7, 2026
Oct 26, 2026
IFB 27-0097 Emergency On-Call Water Main Break Services
Emergency on-call water main break services.
Description: The New York City Department of Design and Construction (DDC) is establishing a city-wide pre-qualified list of contractors to perform emergency reconstruction, replacement, and ancillary restoration of broken water mains across the municipal water distribution system. This is a Request for Qualifications requiring contractors able to mobilize rapidly and provide labor, materials, and equipment for emergency water-main response. The opportunity was published on April 27, 2026, and remains open for applications through late 2040.
StateAgency · NY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from NYC Department of Design & Construction.
Adjacent opportunities open for bidding right now.
CityMA
Posted
Oct 7, 2026
Oct 26, 2026
Emergency on-call water main break services.
NYC Department of Design & Construction
State AgencyNY
Posted
Apr 27, 2026
Dec 31, 2040
The New York City Department of Design and Construction is establishing a pre-qualified contractor list to respond to emergency sewer failures across all five boroughs. This Request for Qualifications seeks firms able to provide labor, materials, equipment, and rapid mobilization to reconstruct or replace collapsed or defective sewers. Selected firms will be placed on a pre-qualified list for immediate call-outs on emergency sewer incidents as directed by the Engineer.
CountyGA
Posted
Sep 8, 2026
Oct 29, 2026
Provide emergency/non-emergency water and sewer line repairs as needed within the unincorporated areas of county for calendar years 2027, 2028, and 2029.
CitySC
Posted
Sep 14, 2026
Oct 14, 2026
Hospital emergency force main repair. Repairs to lift station. Demolish and remove the existing force main piping inside the wet well and clean the wet well as needed to complete the repairs. Remove two (2) existing pump check valves and furnish and install two (2) new check valves compatible with the existing system. Remove two (2) existing plug valves and furnish and install two (2) new plug valves compatible with the existing system. Remove two (2) existing vacuum pumps and furnish and install two (2) new vacuum pumps compatible with the existing system. Remove two (2) existing pump impellers and furnish and install two (2) new pump impellers compatible with the existing pumps and operating conditions. Remove existing steel support brackets and hardware and replace with new stainless-steel support brackets and stainless-steel hardware. Furnish and install a new 4-inch priming lock loop using Schedule 80 PVC piping and fittings on the force main. Furnish and install a new permanent bypass connection on the force main for future bypass pumping operations. Provide temporary bypass pumping from the existing manholes using appropriate pumping equipment while repair work is completed. Upon completion, return the two pumps to service and verify proper operation of the pumps, valves, priming system, and associated components.