FederalMS
Posted
Aug 28, 2026
Oct 21, 2026
500-Ton Trailer-Mounted Air-Cooled Chiller (Request for Proposal)
1 ea, 500-ton trailer-mounted air-cooled chiller.
Description: Proposals for an air cooled chiller replacement project.
SchoolDistrict · UT, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Weber School District.
Adjacent opportunities open for bidding right now.
FederalMS
Posted
Aug 28, 2026
Oct 21, 2026
1 ea, 500-ton trailer-mounted air-cooled chiller.
CountyGA
Posted
Sep 23, 2026
Oct 22, 2026
Provide turnkey roof-top chiller replacement services which includes providing equipment, labor, materials, and all related work necessary for complete installation and operational functionality. The replacement chiller must be of similar tonnage, must be air-cooled, must be equipped with low ambient, and must include a sound dampening package to maintain lower noise levels during operation.
East Bay Municipal Utility District
Special DistrictCA
Posted
Sep 24, 2025
Oct 28, 2026
Furnish, and deliver one (1) rotary screw air-cooled chiller for cooling of digester gas as part of a low pressure digester gas conditioning system.
Minnesota State University Mankato
Higher EducationMN
Posted
Sep 24, 2026
Oct 30, 2026
DESIGN-BID-BUILD - the utility plant houses three centrifugal chillers that provided chilled water for cooling to nearly every building on campus. The design team should evaluate all systems and capacities for the new design. The intent of this project will replace the oldest 1,000-ton chiller with a slightly larger and more efficient 1,200-ton chiller. Provide energy modeling to verify system will meet current and future campus needs and assist in rebates to maximize available rebates. Review the feasibility of updating or replacing the section of switchgear that feeds these services with a fusible section of switchgear that will hold appropriately sized amp fuses. Review the feasibility of replacement or rerouting the sanitary sewer that is plugged due to pipe corrosion under the boiler plant that will not drain properly. The project will be constructed in one phase.