Requires as-needed rehabilitation services for its sewer system manholes and pipelines. Services include, but are not limited to, the following: a. Defect replacement. b. Ring and lid replacement. c. Manhole lining, grouting, or coatings. d. Cured-in-Place-Pipe (CIPP) lining. e. Pipe bursting. f. Slip lining, including PVC fold and form. g. Spot repairs. h. Remote robotic repairs. i. Cellular concrete to abandon utilities and fill voids.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Santa Rosa
County
The county where this buyer is located.
Sonoma
Address
Physical address of this buyer.
404 Aviation Blvd.
Zip Code
Postal code for this buyer's location.
95403-9019
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Sonoma County Water Agency
Flood Zone 1A Committee Special Meeting
Date: Mar 13, 2023Type: Meeting mention
The committee held a special meeting to discuss the Central Sonoma Watershed project and the Matanzas Creek Reservoir Rehabilitation project. The discussion covered the historical context of these flood control facilities, which have exceeded their original design life, and the findings from current vulnerability assessments. Key technical topics included seismic vulnerabilities, hydraulic performance criteria, such as spillway hydrographs and freeboard requirements, and the ongoing planning efforts to update the 1958 Watershed work plan to improve flood protection.
Zone 1A Flood Control Advisory Committee Meeting Minutes
Date: Dec 14, 2021Type: Meeting mention
The committee meeting included presentations on the Vortex Tube Rehabilitation Project regarding the Santa Rosa Creek Diversion Structure, the Central Sonoma Watershed Project's objectives and plans, and an update on the Stream Maintenance Program, including bank repair and vegetation management. Additionally, the committee reviewed and approved the recommended budget for Fiscal Year 2022/23.
Zone 1A Laguna De Santa Rosa/Mark West Creek Watershed Flood Protection Zone Advisory Committee Meeting Minutes
Key Contacts
Public-sector contacts connected to Sonoma County Water Agency.
SO
Susanne OliverAdministration and Human Resources Manager
*******@************
+1 (***) ***-****
CD
Carlos DiazDeputy Director of Engineering in Design
Date: Dec 12, 2023
Type: Meeting mention
The committee reviewed an overview of the high-priority project for the Laguna-Mark West Creek Watershed Master Restoration, covering design, flood mitigation, and habitat restoration benefits. Updates were provided on the 2023 Stream Maintenance Program, including sediment and vegetation management, as well as anticipated projects for 2024. The recommended fiscal year 2024/2025 flood control budget was presented for review, detailing project statuses and study plans. Finally, discussions were held regarding current committee vacancies and the steps involved in the budget authorization process.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Sonoma County Water Agency meetings, strategic plans, and budget discussions before the public bid appears.