Fixed Film Reactor Removal Project
Posted
-
Oct 28, 2026
Project includes, but not limited to, dismantling of existing fixed film reactors (trickling filter). All steel and concrete elements need to be removed and transported for recycling. Plastic filter media (testing positive for lead) approx 4,900 CY shall be removed and stacked on site for removal under separate contract, within a double-lined storage area of not less than 22,000 SF, including cover liner and perimeter erosion controls, constructed by the contractor and left in place at completion of the work. Regrade area of fixed film reactor, plus an additional 50 radius to leave the area flat and place a 3-inch lift of 3/4 grey rock of uniform color.