SR 408 WB on Ramp at N. Alafaya Trail Mast Arm Improvements (408-785B) RFP
Posted
Oct 9, 2026
Nov 9, 2026
Work consists of 1 LS erosion control; 6 SY concrete sidewalk and driveways, 6" thick; 157 LF conduit, furnish & install, open trench; 502 LF conduit, furnish & install, directional bore; 1 PL signal cable- new or reconstructed intersection, furnish & install; 1 AS electrical power service, f&i, underground, meter furnished by power company; 394 LF electrical service wire, furnish & install; 1 EA prestressed concrete pole, f&i, type p-ii service pole; 1 EA aluminum signals pole, furnish & install, pedestal; 1 as pedestrian signal, relocate; 1 EA vehicle detection system - video, furnish & install, cabinet equipment.